This functional Factory Acceptance Testing (FAT) Protocol & Live Execution Script builds directly upon the pre-FAT cold check sign-off. It provides a step-by-step procedure for controlled first-time energisation, safety system trip validation under BS EN 60204-1 / BS EN ISO 13849-1, and systematic PLC I/O loop checks.
Factory Acceptance Testing (FAT) Protocol & Live Script
Document Reference: FAT-PROT-[YEAR]-[001]
Panel Reference: [e.g., MCC-L3-001]
Associated SOW: [SOW-Reference-No]
Test Location: [Workshop / Test Bay Name]
Date of Test: [DD/MM/YYYY]
Test Personnel:
- Lead Electrical Wireman / Commissioning Engineer:
[Contractor Representative] - Lead Controls / Software Engineer:
[Software Engineer Name] - Client / Technical Witness:
[Client Representative Name]
1. Safety Prerequisites & Pre-Energisation Sign-Off
SAFETY NOTICE: Prior to connecting temporary test supplies, verify that the Pre-FAT Cold Inspection Sheet is signed off, all trunking lids are closed, bare copper is shrouded, and test bay barriers/signage are erected.
- [ ] Section 1–6 Cold Checks completed and signed off.
- [ ] Calibration certificates verified for digital multimeter (CAT III/IV) and phase-rotation meter.
- [ ] Temporary 3-phase/neutral/earth supply isolated, locked out, and tagged out (LOTO).
- [ ] Fire protection equipment suitable for electrical fires ($CO_2$) within reach.
2. Stage 1: Initial Controlled Energisation Script
┌──────────────────────────────────────────────────────────────────────────────┐
│ CONTROLLED ENERGISATION SEQUENCE │
├──────────────────────────────────────────────────────────────────────────────┤
│ 1. Isolate all branch MCBs/MPCBs/fuses on the chassis. │
│ 2. Close main incoming switch-disconnector (door isolator). │
│ 3. Prove incoming voltage (L-L, L-N, L-PE) and phase sequence (L1-L2-L3). │
│ 4. Step-energise auxiliary transformers and 24V DC Switch Mode Power Supply. │
│ 5. Sequentially energise downstream field distribution breakers. │
└──────────────────────────────────────────────────────────────────────────────┘
| Step | Action / Procedure | Expected Result | Measured / Observed | Pass / Fail | Initials |
| 1.1 | Open all internal outgoing MCBs, MPCBs, and auxiliary fuses. Leave only the main incoming line switch closed. | Incoming terminals live; all internal load circuits isolated. | Complete isolation confirmed | [ ] | |
| 1.2 | Connect supply. Measure incoming supply voltage at main isolator terminals L1-L2, L2-L3, L3-L1. | $400\text{V AC} \pm 10\%$ ($360\text{V} – 440\text{V}$) balanced across phases. | L1-L2: ______ VL2-L3: ______ VL3-L1: ______ V | [ ] | |
| 1.3 | Measure incoming neutral to earth N-PE. | $< 5\text{V AC}$ under normal workshop supply conditions. | N-PE: ______ V | [ ] | |
| 1.4 | Check phase rotation using calibrated meter. | Clockwise (standard L1-L2-L3 sequence). | Clockwise confirmed | [ ] | |
| 1.5 | Close 24V DC Power Supply primary circuit protection. | PSU powers up; “DC OK” LED illuminated. | Green LED ON | [ ] | |
| 1.6 | Measure regulated DC output at main distribution terminals (+24V to 0V). | $24.0\text{V DC} \pm 0.4\text{V}$ (range $23.6\text{V} – 24.4\text{V}$). | Measured: ______ V | [ ] | |
| 1.7 | Measure DC reference rail to earth (0V to PE). | Matches grounding philosophy: $0.0\text{V}$ (grounded SELV) or high-impedance floating (PELV). | 0V-PE: ______ V | [ ] |
3. Stage 2: Functional Safety Circuits & E-Stop Trip Validation
Tested in accordance with BS EN ISO 13849-1 (PLr architecture) and BS EN 60204-1.
| Step | Safety Device Under Test | Test Method / Operator Action | Expected Reaction | Observed Reaction | Pass / Fail |
| 2.1 | Safety Relay Reset | Ensure all E-Stops released. Press panel door “Safety Reset” pushbutton. | Safety Relay energises; safety contactors pull in; channel LEDs illuminate steady green. | [ ] | |
| 2.2 | Door Emergency Stop (S1) | Depress panel door E-Stop mushroom pushbutton. | Instant drop-out of safety relay and dual redundant contactors ($< 50\text{ ms}$). HMI/Beacon indicates “E-Stop Tripped”. | [ ] | |
| 2.3 | Safety Relay Anti-Tie-Down | Hold Reset button pressed while releasing E-Stop S1. | Relay MUST NOT automatically reset (fault-lockout mode). Manual re-press required. | [ ] | |
| 2.4 | Dual-Channel Cross-Fault Check | Disconnect one channel (Channel A) at safety gate/terminal while relay is active. | Safety relay trips immediately; cross-monitoring detects discrepancy; relay inhibits re-energisation. | [ ] | |
| 2.5 | Safety Interlock Switches (Door Switches) | Actuate guard door magnetic/RFID interlock switch while safety is active. | Safety circuit de-energises; auxiliary contact flags open safety guard on PLC input. | [ ] | |
| 2.6 | Orange Core Foreign Interlocks | Turn main door isolator OFF. Check voltage on designated orange control cores. | Interlock terminals remain active (indicated by orange wire and external supply warning label). | [ ] |
4. Stage 3: PLC I/O Loop Testing & Software Verification
Connect programming terminal via industrial Ethernet/Profinet. Verify individual hardware states against the master engineering I/O list.
Digital Inputs (DI) Verification
Method: Apply local 24V DC test signal / operate field switch sim.
| Channel / Address | Terminal Ref | Description / Signal Name | Hardware State | PLC Monitor Tag | Result |
%I0.0 | X2:1 | Main Air Pressure Switch OK | ON / 24V DC | DI_AirPress_OK = TRUE | [ ] |
%I0.1 | X2:2 | Cell Safety Guard Closed | ON / 24V DC | DI_Guard_Closed = TRUE | [ ] |
%I0.2 | X2:3 | Master Start Pushbutton | Depressed | DI_Master_Start = TRUE | [ ] |
%I0.3 | X2:4 | VFD 1 Fault Healthy Contact | Simulate Trip | DI_VFD1_Trip = TRUE | [ ] |
Digital Outputs (DO) Verification
Method: Force output through PLC engineering software / HMI manual mode.
| Channel / Address | Terminal Ref | Description / Signal Name | Software Force | Physical Reaction | Result |
%Q0.0 | X3:1 | Beacon Green (Running) | FORCE HIGH | Green stack light element illuminated. | [ ] |
%Q0.1 | X3:2 | Beacon Red (Fault/Trip) | FORCE HIGH | Red element illuminated + sounder pulse. | [ ] |
%Q0.2 | X3:3 | Main Contactor 1 Enable | FORCE HIGH | Contactor coil pulls in; auxiliary closes. | [ ] |
%Q0.3 | X3:4 | Pneumatic Solenoid Dump Valve | FORCE HIGH | 24V DC measured at field connector terminals. | [ ] |
Analogue I/O Checks (AI / AO)
Method: Calibrated 4–20mA / 0–10V process loop calibrator.
| Channel | Signal Type | Test Point | 0% Input | 50% Input | 100% Input | Linear Scaled Value | Result |
%IW64 | 4–20 mA | Pressure Transducer | $4.00\text{ mA}$ | $12.00\text{ mA}$ | $20.00\text{ mA}$ | $0.0 – 10.0\text{ bar}$ | [ ] |
%QW64 | 0–10 V | VFD Speed Reference | $0.00\text{ V}$ | $5.00\text{ V}$ | $10.00\text{ V}$ | $0.0 – 50.0\text{ Hz}$ | [ ] |
5. Live Snagging & Punch-List Log
| Item # | System / Component | Defect Observed | Remedial Action Required | Target Rectification | Cleared (Initials) |
| 1 | [e.g., Beacon Sounder] | No audible tone when forced | Check 0V return on terminal X3:5 | Pre-dispatch | [ ] |
| 2 | [e.g., MPCB 2 Aux] | Aux contact normally open instead of NC | Swap terminal connections on block | Pre-dispatch | [ ] |
6. FAT Certification Sign-Off
Conditional Acceptance:
The panel assembly described herein has been tested in accordance with the FAT functional protocol. Subject to the clearance of any minor non-conformances listed in Section 5 above, the panel is certified for dispatch and site delivery.
Lead Commissioning Engineer / Contractor:
Name: ___________________________________
Signature: ________________________________
Date: [DD/MM/YYYY]
Client Witness / Technical Representative:
Name: ___________________________________
Signature: ________________________________
Date: [DD/MM/YYYY]